Helou Construction Portfolio
La Plaza Cultura Village
UCLA Margan Apartments
Park 5th Tower
Banc Of California Stadium
Banc of California Stadium is a soccer-specific stadium under construction in the Exposition Park Los Angeles, California. It will be home of the expansion Major League Soccer team Los Angeles FC. Helou Construction is contracted for glass and glazing installation at this state of the art sports complex.
Apex II Tower
Helou construction is responsible for innovative modern glass and glazing on this project. Located on one of the most popular intersections in downtown Los Angeles, The Apex mixed use high rise is an ode to modern luxury.
888 S. Hope
The Bloc
11×12 Los Angeles
Located at the southeast corner of 11th and Hill Streets, will contain 177 apartments, 7,300 square feet of ground-floor retail space and parking accommodations for up to 276 vehicles and 201 bicycles.
Mo Ostin Basketball Center
State-Of-The-Art basketball practice facility dedicated to honoring current and former UCLA Basketball student-athletes
Practice gyms for both men’s and women’s programs, Locker rooms for both men’s and women’s basketball programs…
East County Detention Center
Located 130 miles east of Los Angeles in Southern California’s Colorado Desert region, the state-of-the-art facility will add beds, improve safety, reduce recidivism and drive economic development.
The Wasserman Football Center
With approximately 35,000 gross square-feet of space, the comprehensive, state-of-the-art Mo Ostin Basketball Center will be located near Pauley Pavilion on the south end of the Los Angeles Tennis Center.
UCLA Glenrock Apartments
Helou Construction was charged with design, supply, and install of aluminum nail fin windows, storefront, skylights, and doors.
University of California Los AngelesUCLA-Glenrock-Apt-5
555 Glenrock Ave
Los Angeles, CA 90024
The Village at Santa Monica
Helou Construction completed installation of 80,000 sf of curtain wall, window wall, storefront, metal paneling, andoperable windows. The Village at Santa Monica isa $350 million mixed-use, mixed-income development that is the final piece in the revitalization of the civic hub in thriving downtown Santa Monica.
Lincoln Place Apartments
Helou Construction completed 1,100+ Milgard Vinyl Nail Fin Windows and Fiberglass Patio Doors. Design, fabrication, and installation of 5,000 SF of Arcadia Storefront, Doors, Operable Windows, Auto Sliders, Point Supported Glass Canopy, and Glass Guardrail.
UC Riverside Glen Mor 2
Helou Construction contracted Glass and Glazing of 50,000 sqf of Curtain Wall, 1200 Aluminum. Single-Hung Windows, and Integrated Aluminum Sun Shades as well as all interior finishes.
UCLA Dykstra
Each room is wired for Internet and Cable T.V.; De Neve Residential Restaurant; 24-hour Front Desk; Recreation and Fitness Room
Panorama Towers III
Build-out of 5 condo sales units within the tower reflecting 5 different architectural themes. Build-out of 4,500 SF Penthouse. Interior buildout of low-rise lobby, gym facilities, and sauna/spa area. Exterior pool construction and all hardscape/landscape.
Panorama Towers I & II
General contractor for the construction of 24 new poolside villas adjacent to Towers 1 and 2. Including exterior pool, interior sauna facility, and all hardscape/landscape construction.
Van Nuys Flyaway
Furnish and install 3 story window wall system, skylights and exterior elevator glass enclosure. Furnish and install insulated aluminum
San Diego Convention Center
Helou Construction is proud of their work on the San Diego Convention Center as they are with all of the projects they are involved with. Helou was involved in comprehensive planning and construction of the center.